Bathroom

Bathroom Renovations

We know a good bathroom build comes down to more than just nice tiles and tapware. It’s the detail behind the walls and under the floors that makes it last. Our team lines up all the right trades - tilers, electricians, plumbers, underfloor heating installers, plasterers and painters - so the job runs smooth from start to finish.
 

Every step matters: proper waterproofing, tidy tile work, wiring and plumbing that’s done once and done right, and finishes that hold up. We keep the site tidy, the timeline realistic, and the end result spot on.

Why Homeowners Choose Us

  • Everything handled in one place - we organise the tilers, plumbers, electricians, plasterers, painters, and underfloor heating so you don’t have to.
     

  • Qualified and experienced - licensed builders and trusted trades who know bathrooms inside out.
     

  • Built to last - waterproofing and workmanship done properly, so you won’t be dealing with leaks or repairs later.
     

  • No surprises - clear timelines and updates so you always know what’s happening.
     

  • Quality finish - clean lines, tidy details, and a bathroom that looks sharp and works well every day.

Modern Bathroom
20241221_133418.jpg
Bathroom

Our Approach

6. Framing & lining

  • Any framing adjustments are made, walls and ceilings are relined, and everything is set up for a solid base.

7. Waterproofing

  • The most important step – membranes and sealants are applied to industry standards so the bathroom stays dry for the long haul.

8. Tiling & finishes

  • Tiles are laid with precision, grout lines kept sharp, and fittings installed. This is where it really starts to take shape.

9. Painting & detail work

  • Plasterers and painters finish the walls and ceilings, and we handle the final touches like mirrors, cabinetry, and accessories.

10. Final check & handover

  • We run through everything with you, make sure it’s spotless, and hand back a bathroom that’s ready to use.

1. Initial chat & site visit

  • We meet to check out the existing bathroom, talk through ideas, layout options, and what you’re wanting to achieve.

2. Design & planning

  • We discuss a practical layout, help with fixture choices, tiles, lighting, and heating. We’ll also flag if any council consent is needed.

3. Quote & timeline

  • You get a clear cost breakdown and a realistic timeline so you know exactly what’s involved.

4. Site prep

  • We protect the rest of your home, set up safe access, and strip out the old bathroom ready for the new build.

5. Plumbing & electrical preline

  • Pipes, wiring, and underfloor heating get run by our trusted plumbers and electricians before the walls are closed back up.

Q. How long does a typical bathroom renovation take?

For a full bathroom renovation in Auckland - including demolition, plumbing and/or electrical prelines, waterproofing, plastering, painting, tiling, and fit-offs - you’re generally looking at 3-5 weeks from start to finish.
 

Here’s a rough timeline most builders and trades follow (assuming no council consent delays and everything runs smoothly):

  • Week 1: Demolition, plumbing and electrical prelines, framing adjustments.
     

  • Week 2: Lining, waterproofing, and start of tiling prep.
     

  • Week 3: Tiling and grout (can stretch longer if full floor-to-ceiling).
     

  • Week 4: Plastering, painting, and final fit-offs (plumbing & electrical).
     

  • Week 5 (if needed): Extra time for custom joinery, tricky tile layouts, underfloor heating, or finishing delays.

Double Sink